AMBASSADOR: Closed-loop Installation for Sustainable Production of Biomethane, BioCO2 and Biofertilizers - A New Standard for Zero Waste Economy
This project is announced in Poland.
- Status
- Announced
- Estimated reduction
- 25,610 tCO2e, period not stated
- Countries
- Poland
- Sector
- Fuels and hydrogen
- Announced
- Not stated
- Expected start
- 2027
About this project
The description is as the source gives it.
The AMBASSADOR project aims to build and operate an innovative biomethane plant in southwestern Poland, utilizing advanced anaerobic digestion of agri-food waste, biogas purification, and CO2 capture to establish a closed-loop zero-waste system. The facility will produce approximately 5 million cubic meters of biomethane (52,591 MWh), 3.98 million m³ of food-grade liquid CO2, and 176,720 tons of digestate annually, achieving 277% GHG emission avoidance compared to natural gas. Over its first five years, it is projected to prevent 128,050 tons of CO2 emissions while promoting circular economy principles and regional development.
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.