Astellas Ireland Energy Efficiency and Renewables Upgrades
This project is under development in Ireland. The source does not give a quantified reduction for this project.
- Status
- Under development
- Estimated reduction
- Not quantified in the source
- Countries
- Ireland
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2027
About this project
The description is as the source gives it.
Astellas Ireland implemented a 1.6 MW Solar PV installation generating 1.4 GWh annually, AHU upgrades with thermal wheel heat recovery, and plans to replace an 800 kW wind turbine with a 2.3 MW unit. These measures increased on-site renewable contribution to 71% and target 84% by 2027, reducing operational emissions. Evidence: "1.6MW Solar PV installation generating 1.4GWH of renewable electricity annually. Air handling unit (AHU) upgrades with thermal wheel heat recovery technology." — https://www.seai.ie/case-studies/astellas-ireland-achieving-significant-sustainable-energy-goals
Statuses, countries and reductions are as the public source states them, and may be out of date.