Skip to main content
Decarbonization project

Austin Fab25 Renewable Power Switch

This project is operational in United States. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
United States
Sector
Renewable power
Announced
Not stated
Expected start
2022

About this project

The description is as the source gives it.

Infineon switched its Austin, Texas semiconductor fab (Fab25) to 100 percent renewable power sourced from local Texas wind farms via Austin Energy. This directly reduces the company's Scope 2 emissions from its own manufacturing operations as part of its carbon-neutrality strategy. Evidence: "Infineon Moves Austin Production Site to Renewable Power; Steps Toward 100 Percent Green Energy for U.S. Sites by the End of the Year" — https://www.stocktitan.net/news/IFNNY/infineon-moves-austin-production-site-to-renewable-power-steps-x9s0vk8aihr8.html

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project