BDMS Solar Rooftop Systems Installation

This project is operational in Thailand.

Status
Operational
Estimated reduction
7,097 tCO2e a year
Countries
Thailand
Sector
Renewable power
Announced
Not stated
Expected start
Not stated

About this project

The description is as the source gives it.

BDMS has installed solar rooftop photovoltaic systems at 36 hospital and facility sites across its network in Thailand. In 2024 these systems generated 14,197.51 MWh of renewable electricity, directly reducing the company's Scope 2 emissions from grid power consumption. Additional installations were ongoing in 2024 as part of efforts to increase renewable energy share to 15% by 2030. Evidence: "BDMS has installed a solar rooftop system at 36 sites. In 2024, the solar rooftop system generated 14,197.51 MWh. Therefore, BDMS was able to reduce total GHG emissions by 7,097.34 tons CO2 eq." — https://investor.bdms.co.th/storage/downloads/tfd-report/bdms-tfd-report-2024-en.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.