Skip to main content
Decarbonization project

BOC Cheung Sha Wan Building Solar Panels

This project is operational in Hong Kong SAR China. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Hong Kong SAR China
Sector
Renewable power
Announced
Not stated
Expected start
Not stated

About this project

The description is as the source gives it.

BOCHK installed and commissioned photovoltaic solar panels at the BOC Cheung Sha Wan Building to generate self-produced renewable energy and reduce Scope 2 emissions from its operations. Additional renewable energy facilities are planned for other sites including Bank of China Centre and BOC Prince Edward Building. Evidence: "We have introduced photovoltaic solar panels or wind power systems at suitable properties to achieve self-generated renewable energy. For example, solar panels have been installed and commissioned at the BOC Cheung Sha Wan Building, and new renewable energy facilities are being planned for the Bank of China Centre and the BOC Prince Edward Building." — https://www.bochk.com/dam/esg/green-banking_en.html

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project