Skip to main content
Decarbonization project

Brindisi On-Site Solar Array

This project is operational in Italy. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Italy
Sector
Renewable power
Announced
Not stated
Expected start
2024

About this project

The description is as the source gives it.

Avio Aero, a GE Aerospace company, installed and began operating a 1.0 MW on-site solar array at its Brindisi, Italy facility in May 2024. The installation has provided the facility with about 658 MWh of its total electricity since commissioning as part of efforts to increase carbon-free electricity generation. Evidence: "Our site in Brindisi, Italy, operated by Avio Aero, a GE Aerospace company, began operating a 1.0 MW solar array in May 2024. Since then, it has provided the facility with about 658 MWh of its total electricity." — https://www.geaerospace.com/sites/default/files/2025-sustainability-report.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project