Cajuína Wind Farm JV with AES Brasil
This project is under development in Brazil. The source does not give a quantified reduction for this project.
- Status
- Under development
- Estimated reduction
- Not quantified in the source
- Countries
- Brazil
- Sector
- Renewable power
- Announced
- 17 August 2021
- Expected start
- 2024
About this project
The description is as the source gives it.
BRF (predecessor to MBRF) formed a joint venture with AES Brasil to develop and own a share of the Cajuína onshore wind complex in Rio Grande do Norte, Brazil, for self-generation and supply to its industrial operations via a 15-year PPA. The project has ~165 MW installed capacity, with BRF investing approximately R$80-92 million for its stake to meet a significant portion of its Brazilian electricity needs from renewables. Evidence: "A AES Brasil Energia e a companhia de alimentos BRF anunciaram nesta terça-feira (17) a formação de uma joint venture com controle compartilhado para a construção de um parque eólico para autogeração no Complexo Eólico Cajuína, Rio Grande do Norte." — https://www.cnnbrasil.com.br/economia/macroeconomia/brf-e-aes-brasil-formam-jv-para-construir-parque-eolico-no-nordeste/
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.