Captive Solar Power Plant at Dewas Manufacturing Site
This project is operational in India. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- India
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- Not stated
About this project
The description is as the source gives it.
Sun Pharma installed a captive solar power plant to meet partial power requirements at its Dewas manufacturing site in India as part of efforts to increase renewable energy share in operations. Evidence: "Installed captive solar power plant to meet partial power requirement at Dewas manufacturing site." — https://sunpharma.com/wp-content/uploads/2024/08/SEIntimationforESGOverview.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.