Coquelles On-Site Wind Farm
This project is operational in France. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- France
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2010
About this project
The description is as the source gives it.
Getlink's Eurotunnel subsidiary operates three Enercon E48 wind turbines (total 2.4 MW capacity) installed on the French Coquelles terminal site. The wind farm has been generating renewable electricity on-site since 2010 to support the company's operations and local supply. Evidence: "Eurotunnel has chosen a tried and tested wind turbine technology for this project, the highly efficient Enercon E 48 turbine." — https://press.getlinkgroup.com/news/eurotunnel-inaugurates-wind-farm-in-coquelles-and-reaffirms-its-commitment-to-sustainable-development-548f-0791e.html
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.