Fleet Shore Power Electrification
This project is operational in United States. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Transport and logistics
- Announced
- Not stated
- Expected start
- 2023
About this project
The description is as the source gives it.
Carnival Corporation has equipped 64-70% of its fleet with shore power connection capability, enabling ships to shut down engines in port and connect to landside electricity grids. This includes connections at multiple ports and ongoing expansions such as the Whittier Cruise Ship Terminal Electrification Project in Alaska. Evidence: "Achieved a 64% fleet shore power connection capability in 2023 and established an interim goal to achieve 75% by 2028 and 80% by 2030" — https://www.carnivalcorp.com/wp-content/uploads/2025/08/FY2024-Sustainability-Report-FINAL.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.