Gumi and Gwangju Solar PPA Facilities
This project is operational in South Korea. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- South Korea
- Sector
- Renewable power
- Announced
- November 2023
- Expected start
- 2024
About this project
The description is as the source gives it.
Samsung Electronics signed 20-year solar power purchase agreements for 5.8 MW facilities installed at its Gumi and Gwangju manufacturing sites in South Korea. The sites began receiving renewable electricity from these on-site solar installations in 2024 as part of efforts to transition to 100% renewable energy in the DX Division. Evidence: "The DX sector completed solar PPA facilities with a capacity of a total of 5.8 megawatts (MW) at its Gwangju and Gumi manufacturing sites in ..." — https://biz.chosun.com/en/en-it/2025/06/27/DQE23MGCMNAWZECTGPSW3RCV44/
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3