Hospital São Lucas Gas-to-Electric HVAC Electrification

This project is operational in Brazil.

Status
Operational
Estimated reduction
687 tCO2e, period not stated
Countries
Brazil
Sector
Buildings and efficiency
Announced
Not stated
Expected start
2023

About this project

The description is as the source gives it.

DASA replaced the gas (GLP) air conditioning system with an automated electric system at Hospital São Lucas, avoiding gas consumption and associated emissions as part of energy efficiency and electrification efforts in its hospital operations. Evidence: "Substituição do sistema de climatização a gás (GLP) por sistema elétrico automatizado no Hospital São Lucas, resultando em: Consumo de gás evitado de 5.928.980,4 GJ (687 tCO₂), em relação a 2023" — https://api.mziq.com/mzfilemanager/v2/d/462fb86b-9204-4615-b834-120f3d454792/cba8970d-f5b7-30f9-6b1d-d0f5ee49a24b?origin=2

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project