This project is operational in Brazil.
- Status
- Operational
- Estimated reduction
- 687 tCO2e, period not stated
- Countries
- Brazil
- Sector
- Buildings and efficiency
- Announced
- Not stated
- Expected start
- 2023
About this project
The description is as the source gives it.
DASA replaced the gas (GLP) air conditioning system with an automated electric system at Hospital São Lucas, avoiding gas consumption and associated emissions as part of energy efficiency and electrification efforts in its hospital operations. Evidence: "Substituição do sistema de climatização a gás (GLP) por sistema elétrico automatizado no Hospital São Lucas, resultando em: Consumo de gás evitado de 5.928.980,4 GJ (687 tCO₂), em relação a 2023" — https://api.mziq.com/mzfilemanager/v2/d/462fb86b-9204-4615-b834-120f3d454792/cba8970d-f5b7-30f9-6b1d-d0f5ee49a24b?origin=2
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.