Jilin Oilfield CCUS CO2-EOR Project
This project is operational in China. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- China
- Sector
- Carbon capture and removal
- Announced
- Not stated
- Expected start
- 2009
About this project
The description is as the source gives it.
PetroChina operates the Jilin Oilfield CCUS project involving CO2 capture from nearby sources, EOR injection, and geological storage in the Songliao Basin. As of end-2024, over 3.5 million tonnes of CO2 have been injected and stored, making it China's highest storage CCUS project. This ongoing operational project directly cuts Scope 1 emissions in PetroChina's oil production operations. Evidence: "As of the end of 2024, over 3.50 million tonnes of CO2 have been injected and stored under Jilin Oilfield, the highest storage amount in China." — https://www.cnpc.com.cn/en/environmentcase/202504/fdc063d5b17e4ea88fd63291667afc59.shtml
Statuses, countries and reductions are as the public source states them, and may be out of date.