Kerry and Shenyang Solar Power Installations
This project is operational in China and Ireland. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- China and Ireland
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Astellas introduced solar power generation equipment at its Kerry Plant in Ireland and Shenyang Plant in China during fiscal 2024, along with starting use of off-site solar power. These on-site and contracted renewables support Scope 1+2 emission reductions aligned with SBTi targets. Evidence: "In fiscal 2024, we introduced solar power generation equipment at both the Kerry and Shenyang Plants and started using off-site solar power" — https://www.astellas.com/content/dam/astellas-com/global/en/documents/environment-ehs-report-fy2025-en.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.