Kia Georgia West Point Solar Canopy Project
This project is operational in United States. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2026
About this project
The description is as the source gives it.
Installation of a 10 MW solar canopy system integrated with hail protection over 3.2 million square feet at Kia's West Point manufacturing facility in Georgia, USA. The on-site renewable energy project offsets approximately 10% of the plant's annual electricity use and supports Kia's RE100 goals by generating clean power consumed directly on-site. Evidence: "3.2 million square feet of automotive hail protection and 10 MW of solar capacity strengthen resilience and sustainability at the West Point manufacturing plant" — https://www.kiageorgia.com/kia-georgia-and-vps-complete-landmark-automotive-hail-protection-and-solar-canopy-project/
Statuses, countries and reductions are as the public source states them, and may be out of date.