Kranji Reservoir Floating Solar Farm
This project is announced in Singapore. The source does not give a quantified reduction for this project.
- Status
- Announced
- Estimated reduction
- Not quantified in the source
- Countries
- Singapore
- Sector
- Renewable power
- Announced
- 28 March 2025
- Expected start
- Not stated
About this project
The description is as the source gives it.
Sembcorp signed a 25-year renewable energy purchase agreement with a Meta Platforms subsidiary to build, own and operate a 150MWp floating solar farm at Kranji Reservoir. This owned renewable asset contributes to Sembcorp's Scope 1/2 emissions reduction through increased clean energy generation in its portfolio. Evidence: "We also signed a 25-year renewable energy purchase agreement with a subsidiary of Meta Platforms to build, own and operate a 150MWp floating solar farm at Kranji Reservoir" — https://www.sembcorp.com/media/z2ypqfjj/sembcorp-ar25.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.