Laixi Photovoltaic Power Stations
This project is operational in China. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- China
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Shandong Gold Mining introduced six photovoltaic power stations by the end of 2024 as part of its clean energy development and Carbon Peaking Action Plan to optimize energy structure and reduce emissions in its mining operations. The stations enable consumption of approximately 400 million kWh of renewable electricity. This qualifies as on-site renewables cutting Scope 2 emissions in own operations. Evidence: "By the end of 2024, the Company had introduced six photovoltaic power stations, with a cumulative capacity to consume approximately 400 million kWh." — https://www.hkexnews.hk/listedco/listconews/sehk/2025/0424/2025042403240.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.