Skip to main content
Decarbonization project

Lessines Belgium On-site Solar System

This project is operational in Belgium. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Belgium
Sector
Renewable power
Announced
Not stated
Expected start
2021

About this project

The description is as the source gives it.

Baxter Healthcare installed a 1.2 MW on-site solar system at its Lessines, Belgium facility in 2021. The system generates renewable electricity for the site's operations, supporting Baxter's goals for on-site renewables and emissions reduction in direct operations. Evidence: "In 2021, we installed an on-site 1.2 MW solar system at Lessines, Belgium, which is expected to generate 1,272 MWh annually and provide 8% of ..." — https://www.baxterhealthcare.co.uk/sites/g/files/ebysai1286/files/2023-03/Baxter%20Healthcare%20UK%20CarbonReductionPlan%20March23%20FINAL.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project