Skip to main content
Decarbonization project

Maastricht Mill E-Boiler Installation

This project is operational in Netherlands. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Netherlands
Sector
Renewable power
Announced
2 May 2022
Expected start
2022

About this project

The description is as the source gives it.

Sappi Maastricht Mill in the Netherlands installed an e-boiler to convert renewable electricity from wind and solar into process steam, replacing fossil gas. A second e-boiler is under construction with commissioning planned for end of 2025. Evidence: "Beginning in 2021, the mill began a €6 million project to install an ‘e-boiler’ that can convert electrical power from solar and wind into the steam needed." — https://www.sappi.com/en-gb/insights/articles/switching-renewables-maastricht-mill-e-boiler

Statuses, countries and reductions are as the public source states them, and may be out of date.