Skip to main content
Decarbonization project

Maranello Trigeneration Plant Shutdown and PV Expansion

This project is operational in Italy. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Italy
Sector
Renewable power
Announced
2022
Expected start
2024

About this project

The description is as the source gives it.

Ferrari shut down its gas-fueled trigeneration plant at the Maranello factory three months ahead of schedule to replace methane gas consumption with renewable sources. The company is doubling photovoltaic capacity from 5 MWp to 10 MWp by 2030, achieving about 40% renewable coverage of site needs via self-generation and PPAs. Evidence: "it will ensure a 60% annual reduction in Scope 1 and 2 CO2 emissions, and a 70% reduction in methane gas consumption compared to previous levels" — https://www.ferrari.com/en-EN/corporate/articles/ferrari-shuts-down-trigeneration-plant-and-focuses-on-renewables

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project