Maranello Trigeneration Plant Shutdown and PV Expansion
This project is operational in Italy. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Italy
- Sector
- Renewable power
- Announced
- 2022
- Expected start
- 2024
About this project
The description is as the source gives it.
Ferrari shut down its gas-fueled trigeneration plant at the Maranello factory three months ahead of schedule to replace methane gas consumption with renewable sources. The company is doubling photovoltaic capacity from 5 MWp to 10 MWp by 2030, achieving about 40% renewable coverage of site needs via self-generation and PPAs. Evidence: "it will ensure a 60% annual reduction in Scope 1 and 2 CO2 emissions, and a 70% reduction in methane gas consumption compared to previous levels" — https://www.ferrari.com/en-EN/corporate/articles/ferrari-shuts-down-trigeneration-plant-and-focuses-on-renewables
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.