Midland Basin 10 MW Solar Farm
This project is operational in United States. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
ConocoPhillips installed and commissioned a 10 MW behind-the-meter solar farm in the Midland Basin that supplies renewable power directly to its oil and gas operations. The project generated first power in Q3 2024 as part of efforts to reduce Scope 1 and Scope 2 emissions through on-site renewables. Evidence: "Generated first power in Q3 2024 on a 10 MW project in Midland Basin; provides renewable energy directly to our operations." — https://www.conocophillips.com/sustainability/low-carbon-technologies/scope-1-and-2-emissions-reduction-activities/
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.