Nevada Gold Mines 200MW TS Solar Power Plant
This project is operational in United States.
- Status
- Operational
- Estimated reduction
- 234,000 tCO2e a year
- Countries
- United States
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Barrick-operated Nevada Gold Mines (NGM), a joint venture, completed construction of a 200 MW solar power plant in two phases. The facility produces 17% of NGM’s annual power demand and reduces emissions through on-site renewable energy generation. It is part of Barrick’s broader decarbonization efforts including power plant modifications. Evidence: "The Barrick-operated Nevada Gold Mines (NGM), a joint venture with Newmont Corporation, has completed the construction of the second and final phase of a 200-megawatt solar power plant, which will have the capacity of producing 17% of NGM’s annual power demand while realizing an equivalent emissions reduction of 234 Kt of carbon dioxide per year." — https://www.barrick.com/English/news/news-details/2024/nevada-gold-mines-completes-construction-of-200-megawatt-solar-power-plant/default.aspx
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.