Skip to main content
Decarbonization project

Olimpiada and Blagodatnoye Climate Project Grid Connection

This project is operational in Russia.

Status
Operational
Estimated reduction
More than 4 tCO2e in total
Countries
Russia
Sector
Other or unclear
Announced
13 May 2024
Expected start
Not stated

About this project

The description is as the source gives it.

Polyus Krasnoyarsk JSC constructed and upgraded several power substations and overhead power lines at the Olimpiada and Blagodatnoye gold deposits. This enabled reconnection of some consumers previously using coal and petroleum fuel power generation to less carbon-intensive grid supply from Rosseti PJSC networks, reducing Scope 1 and 2 emissions in own operations. Evidence: "Under the scope of the project, Polyus Krasnoyarsk constructed and upgraded several power substations and overhead power lines; some consumers at the Olimpiada and Blagodatnoye mines that used coal and petroleum fuel for power generation were reconnected to less carbon-intensive power supply from Rosseti PJSC grids." — https://polyus.com/en/media/press-releases/polyus-has-registered-its-first-climate-project

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project