On-site 3.32 MWp Photovoltaic Power Plant
This project is operational in China. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- China
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Huadong Medicine built and operates a 3.32 MWp PV plant at its facilities to generate renewable electricity for on-site use, directly reducing Scope 2 emissions from purchased power. The plant generated 3,284,295 kWh in 2024, with plans for an energy storage system in 2025 to improve utilization. Evidence: "Built a 3.32 MWp PV plant, generating 3,284,295 kWh in 2024. ... Photovoltaic Power Generation: The Company has built a 3.32 MWp PV plant, generating 3,284,295 kWh in 2024." — http://money.finance.sina.com.cn/corp/view/vCB_AllBulletinDetail.php?stockid=000963&id=11227019
Statuses, countries and reductions are as the public source states them, and may be out of date.