Skip to main content
Decarbonization project

On-site Renewables and Waste-to-Energy at Two Taikoo Place

This project is operational in Hong Kong SAR China. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Hong Kong SAR China
Sector
Renewable power
Announced
Not stated
Expected start
Not stated

About this project

The description is as the source gives it.

Swire Properties installed solar photovoltaic panels, a wind turbine, and a waste-to-energy tri-generation system at Two Taikoo Place in Hong Kong. These generate renewable energy equivalent to approximately 6% of the landlord’s building energy needs. Evidence: "At Two Taikoo Place, it has installed solar photovoltaic (PV) panels, a wind turbine, and a waste-to-energy tri-generation system, which is estimated to supply renewable energy equivalent to approximately 6% of the landlord’s building energy." — https://sr.swirepacific.com/en/sr2024/swirethrive/climate

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project