Otsuka Pharmaceutical installed and expanded solar power generation systems at six domestic factories including Tokushima Second, Tokushima Itano, Takasaki, Tokushima, Tokushima Mima, and Tokushima Wajiki. The systems became operational between September 2024 and December 2025, generating renewable electricity for on-site use to reduce Scope 2 emissions. Evidence: "Otsuka Pharmaceutical Co., Ltd. (Otsuka) has announced the launch of solar power generation systems at the Tokushima Second Factory and expanded existing systems at the Tokushima Itano, Takasaki, Tokushima and Tokushima Mima Factories. These systems became operational between September 2024 and December 2025. As a result of these initiatives, annual CO2 emissions are expected to be reduced by approximately 3,189 tons across the six domestic factories where these systems have been installed." — https://www.otsuka.co.jp/en/company/newsreleases/2026/20260119_1.html
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.