On-site Solar PPA at Northeast Bakersfield Treatment Plant
This project is announced in United States. The source does not give a quantified reduction for this project.
- Status
- Announced
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- 23 July 2025
- Expected start
- Not stated
About this project
The description is as the source gives it.
California Water Service signed a 20-year power purchase agreement with EDP Renewables North America for a 1.75 MWac / 2.35 MWdc onsite solar photovoltaic array at its Northeast Bakersfield Treatment Plant. The project provides on-site distributed solar power to reduce the utility's long-term environmental footprint through contracted renewables in its own operations. It is part of broader efforts to procure renewable energy and lower Scope 2 emissions. Evidence: "Power purchase agreement will provide Cal Water with 20 years of on-site distributed solar power at key Bakersfield District treatment facility." — https://www.prnewswire.com/news-releases/edp-renewables-north-america-announces-20-year-ppa-with-california-water-service-302511888.html
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.