PCHQ 1.8 MW On-Site Solar Array

This project is operational in United States. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
United States
Sector
Renewable power
Announced
Not stated
Expected start
2023

About this project

The description is as the source gives it.

Progressive installed a 1.8-megawatt solar panel array covering 8.4 acres at its Campus II headquarters location in Mayfield Village, Ohio. Construction began in 2021, the array was completed in 2022 and became operational in 2023, generating renewable energy for the site and producing RECs. Evidence: "In 2022, we completed construction of a 1.8-megawatt (MW) solar array at PCHQ as pictured above, which went live in 2023 and is contributing renewable energy to that location. Our solar array is verified as a qualified renewable energy source from the State of Ohio and, in March 2024, it was approved to generate Renewable Energy Certificates (RECs)." — https://www.progressive.com/about/purpose/environment/

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project