This project is operational in Portugal. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Portugal
Sector
Fuels and hydrogen
Announced
April 2020
Expected start
2025

About this project

The description is as the source gives it.

EDP installed and operates a 1.25 MW PEM electrolyzer at its Ribatejo combined cycle power plant in Carregado, Portugal, to produce green hydrogen for injection into the gas turbine. This insetting project at EDP's own thermal asset demonstrates fuel switching and flexibility for decarbonizing operations, with first hydrogen molecule produced and injected in September 2025 as part of the EU-funded FLEXnCONFU project. Evidence: "EDP marks a historic milestone by producing the Group’s first hydrogen molecule in Europe and injecting it into a gas turbine in a real industrial environment. This initiative is part of the European FLEXnCONFU project and was carried out at the Ribatejo combined cycle power plant" — https://edp.com/en/media/news/edp-produces-its-first-hydrogen-molecule-europe

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project