This project is under development in United States. The source does not give a quantified reduction for this project.
- Status
- Under development
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2026
About this project
The description is as the source gives it.
CoStar Group is developing a 750,000 square-foot expansion to its Richmond campus, targeting LEED Net Zero and WELL Platinum certifications. The project includes on-site photovoltaic panels expected to generate 1,300 MWh annually for building needs and EV chargers, plus plans for a renewable energy PPA with a local provider. Construction is underway with completion targeted for 2026. Evidence: "To support LEED Net Zero designation, we plan to source renewable energy through a power purchase agreement with a local energy provider and build photovoltaic panels (PV) in the building’s facade, canopies, and rooftops. The PV panels are expected to collect 1,300 megawatt-hours of energy" — https://www.costargroup.com/sites/costargroup.com/files/2025-04/CoStar%20Group-Corporate%20Responsibility%20Report-2025.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.