Skip to main content
Decarbonization project

Riverdale Data Centre On-Site Solar Installation

This project is operational in United Kingdom.

Status
Operational
Estimated reduction
More than 35 tCO2e in total
Countries
United Kingdom
Sector
Renewable power
Announced
Not stated
Expected start
2021

About this project

The description is as the source gives it.

In 2021, solar panels were installed on the rooftop of the Riverdale Data Centre in London to generate renewable electricity for lighting and reduce CO2 emissions from operations. The installation has generated over 175,000 kWh since commissioning through the end of 2024. Evidence: "In 2021, solar panels were installed at the Riverdale Data Centre with the aim of reducing CO emissions. From the time of their installation until the end of 2024, these solar panels generated over 175,000 kWh, which is equivalent to the avoidance of over 35 tCO e." — https://www.citigroup.com/rcs/citigpa/storage/public/2025-carbon-reduction-plan-citibank-na-cbna-london-branch.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project