Seres Super Factory Longxing Solar PV and Zero-Carbon Certification

This project is operational in China. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
China
Sector
Renewable power
Announced
Not stated
Expected start
2025

About this project

The description is as the source gives it.

Seres Group installed 175.8 MW of photovoltaic capacity at its Super Factory (Longxing) with annual generation of 146,468.2 MWh, supported by a digital twin energy management system. The facility achieved authoritative Zero-Carbon Factory benchmark certification. Additional measures include a factory-in-factory model and zero-carbon intelligent logistics hub to reduce transportation emissions. Evidence: "In 2025, the Seres Super Factory (Longxing) introduced an advanced digital twin energy management system. Both installed photovoltaic capacity and power generation reached record levels. The facility received an authoritative “Zero-Carbon Factory” benchmark certification. Through coordinated initiatives such as the “factory-in-factory” model and a zero-carbon intelligent logistics hub, we significantly reduced transportation-related emissions." — https://stockmc.xueqiu.com/202603/601127_20260331_GNIN.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project