Sézanne France Onsite Solar PV Installation
This project is operational in France. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- France
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Kenvue completed a ground-mounted solar PV power plant at its manufacturing site in Sézanne, France, with 1.75 MW capacity as part of its renewable electricity strategy. The installation covers approximately 22% of the site's annual energy consumption and contributes to Scope 1 and 2 emissions reductions through on-site renewables. Evidence: "Since the beginning of 2024, Kenvue has completed new onsite solar installations at its Sezanne, France, and Madra, Greece manufacturing sites, which will provide 1.75MW and 0.186MW of renewable energy, respectively." — https://investors.kenvue.com/financial-news/news-details/2024/Kenvue-Drives-Climate-Action-Strategy-Forward/default.aspx
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.