Skip to main content
Decarbonization project

Tahara Plant On-site Wind and Solar Renewables

This project is operational in Japan. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Japan
Sector
Renewable power
Announced
2023
Expected start
2023

About this project

The description is as the source gives it.

Toyota installed five large wind turbines and approximately 1,200 solar panels at its Tahara Plant in Japan as part of efforts to achieve plant-level carbon neutrality through owned renewable energy generation for own manufacturing operations. Evidence: "The plant has introduced a number of large-scale initiatives to reduce emissions, including eye-catching wind turbines standing approximately 145 meters tall—among the largest in Japan—as well as around 1,200 solar panels installed along the test course. ... In FY2026, this enormous plant became the first within Toyota to attain carbon neutrality at the plant level." — http://toyotatimes.jp/en/newscast/185.html

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project