Virtual PPA for New Minami Osumi Wind Farm
This project is announced in Japan. The source does not give a quantified reduction for this project.
- Status
- Announced
- Estimated reduction
- Not quantified in the source
- Countries
- Japan
- Sector
- Renewable power
- Announced
- 27 December 2024
- Expected start
- 2027
About this project
The description is as the source gives it.
KDDI signed a 20-year virtual PPA with J-Wind (J-POWER subsidiary) for environmental value from the repowered onshore wind farm in Kagoshima Prefecture. This supports reduction of CO2 emissions from KDDI base stations in the Kyushu area by approximately 50%. The project involves upgrading the existing wind farm with new turbines expected to start operations in December 2027. Evidence: "KDDI and J-POWER Signed Virtual PPA for Onshore Wind Power Generation" — https://newsroom.kddi.com/english/news/detail/kddi_nr-423_3699.html
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3