Yeosu Plant CCU Pilot Facility with Membrane Technology
This project is operational in South Korea. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- South Korea
- Sector
- Carbon capture and removal
- Announced
- March 2021
- Expected start
- 2021
About this project
The description is as the source gives it.
Lotte Chemical installed and operated a carbon capture and utilization (CCU) pilot facility using gas separation membrane technology at Yeosu Plant 1. The pilot ran test operations for nine months starting March 2021, capturing CO2 from plant emissions for potential use in polycarbonate production or other applications. Evidence: "In March of this year, LOTTE Chemical installed CCU pilot facilities at Yeosu Plant 1 and conducted test operations for nine months." — https://www.lottechem.com/en/media/news/461/view.do
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.