100 MW Solar PV Power Plant at Cardinal Namdini Gold Mine

This project is under development in Ghana.

Status
Under development
Estimated reduction
92,000 tCO2e a year
Countries
Ghana
Sector
Renewable power
Announced
Not stated
Expected start
Not stated

About this project

The description is as the source gives it.

On-site 100 MW solar photovoltaic power plant under construction at the Cardinal Namdini gold mine in Ghana's Upper East Region to supply renewable electricity for mining operations. The project incorporates solar-agriculture synergy allowing crop cultivation under panels. It is expected to reduce carbon dioxide emissions by an estimated 92,000 tonnes annually. Evidence: "its 100MW solar photovoltaic power plant under construction in the Upper East Region would reduce carbon dioxide emissions by an estimated 92,000 tonnes annually. The project also incorporates a “solar–agriculture synergy” system" — https://www.modernghana.com/news/1456196/shandong-gold-invests-in-solar-power-and-local.html

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project