AIS Renewable Energy Systems Installation
This project is operational in Thailand.
- Status
- Operational
- Estimated reduction
- 53,688 tCO2e, period not stated
- Countries
- Thailand
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- Not stated
About this project
The description is as the source gives it.
AIS installed 13,482 renewable energy systems as part of its Decarbonization Roadmap to reduce Scope 1 and 2 emissions from its telecom operations and network infrastructure. These on-site renewables, combined with AI-powered energy optimization and equipment upgrades, achieved a total reduction of 53,688 metric tons of CO2 equivalent. Evidence: "To achieve this, AIS has integrated GHG reduction measures into its business operations, including the installation of 13,482 renewable energy systems, network energy optimization through AI-powered solutions, and the replacement of legacy network equipment with energy-efficient technologies. These initiatives contributed to a total reduction of 53,688 metric tons of CO equivalent." — https://sustainability.ais.co.th/en/sustainability-priorities/act-on-climate/climate-actions
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.