Barcelona Cruise Terminals Solar Installation
This project is operational in Spain. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Spain
- Sector
- Renewable power
- Announced
- 12 September 2024
- Expected start
- 2024
About this project
The description is as the source gives it.
Carnival Corporation installed 1,350 rooftop solar panels at its Palacruceros and Helix Cruise Center terminals in the Port of Barcelona to generate renewable electricity for terminal operations, with surplus exported to the grid. Evidence: "Solar panels are being installed at Helix Cruise Center and Palacruceros... collectively produce 866,000-plus kilowatt-hours per year." — https://www.seatrade-cruise.com/environmental-health/carnival-installing-solar-power-at-two-barcelona-cruise-terminals
Statuses, countries and reductions are as the public source states them, and may be out of date.