Bogasari Cibitung Rooftop Solar PV Installation

This project is operational in Indonesia. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Indonesia
Sector
Renewable power
Announced
Not stated
Expected start
2022

About this project

The description is as the source gives it.

PT Indofood Sukses Makmur Tbk's Bogasari flour division installed a 1 MWp rooftop solar power plant at its Cibitung factory in Bekasi, West Java, Indonesia. The system, operational since September 2022, consists of 2,274 solar panels and supports the company's green industry commitment by generating on-site renewable electricity for its own operations. Evidence: "Since September 2022, the Bogasari flour factory in Cibitung, Bekasi Regency, West Java, has been using a rooftop solar power plant with a capacity of 1 megawatt-peak (MWp) ... Carbon emissions have been reduced by 2,382,536 kilograms of CO2 equivalent" — https://www.kompas.id/artikel/en-plts-atap-jalan-hijau-industri-memangkas-biaya-operasional

Statuses, countries and reductions are as the public source states them, and may be out of date.