Skip to main content
Decarbonization project

Borox Solar Plant Installation

This project is operational in Spain. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Spain
Sector
Renewable power
Announced
Not stated
Expected start
2024

About this project

The description is as the source gives it.

GRUMA installed a solar plant at its facility in Borox, Spain, covering 30,000 square meters with 4,320 panels generating over 2,800 kW. The system supplies 30% of the site's energy consumption as part of efforts to increase renewable energy use and reduce emissions in operations. Evidence: "Notably, the installation of our solar plant in Borox, Spain, spanning 30,000 square meters and equipped with 4,320 panels, produces over 2,800 kilowatts, supplying 30% of the site’s energy consumption" — https://www.gruma.com/media/730551/reporte_esg_gruma_2024.pdf

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project