Skip to main content
Decarbonization project

DAF Eindhoven and Massbach Solar Panel Systems

This project is operational in Germany and Netherlands. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Germany and Netherlands
Sector
Renewable power
Announced
Not stated
Expected start
2024

About this project

The description is as the source gives it.

Installation of two solar panel systems totaling 7,500 panels at the DAF production location in Eindhoven, Netherlands, and the PACCAR distribution center in Massbach, Germany. The systems produced over 2,500 MWh of electricity in 2025 as part of efforts to increase renewable energy use and reduce emissions at manufacturing and distribution sites. Evidence: "In 2024, we have installed two solar panel systems at our production location in Eindhoven and our PACCAR distribution center in Massbach. They consist of 7,500 solar panels in total and they produced over 2,500 MWh in 2025." — https://www.daf.com/en/about-daf/sustainability/environment-emission-reduction/sustainable-production-facilities

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project