Skip to main content
Decarbonization project

DAF Westerlo Solar Panel Systems

This project is operational in Belgium. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Belgium
Sector
Renewable power
Announced
Not stated
Expected start
2025

About this project

The description is as the source gives it.

Installation of two solar panel systems at the DAF production location in Westerlo, Belgium, in August 2025. These systems produced almost 400 MWh of electricity in 2025, contributing to expanded on-site renewable generation across DAF facilities with a combined total exceeding 10,000 panels. Evidence: "In August 2025, two solar panel systems were installed at our production location in Westerlo which produced almost 400 MWh in 2025. The combined solar panel area now exceeds 10,000 panels." — https://www.daf.com/en/about-daf/sustainability/environment-emission-reduction/sustainable-production-facilities

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project