Dongen Site Electrification and Heat Grid Project
This project is operational in Netherlands. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Netherlands
- Sector
- Fuels and hydrogen
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
At its Dongen bottling facility in the Netherlands, CCEP installed two electric boilers, heat pumps, and a 4 km heat grid network to capture and reuse residual heat, replacing natural gas systems. The site sources 100% renewable electricity from a nearby cooperative wind farm and solar park via Eneco, achieving significant decarbonization of manufacturing processes. Evidence: "in 2024, we installed two new electric boilers to replace their natural gas-powered predecessors. The e-boilers are part of an innovative new ‘Heat Grid’ system that captures residual heat from across the site. Using two new heat pumps and a network of four kilometres of stainless-steel pipework, we can transport waste heat from one process to another." — https://www.cocacolaep.com/news-and-stories/dongen-decarbonisation/
Statuses, countries and reductions are as the public source states them, and may be out of date.