Eastern Goldfields Power Project (KCGM)
This project is announced in Australia. The source does not give a quantified reduction for this project.
- Status
- Announced
- Estimated reduction
- Not quantified in the source
- Countries
- Australia
- Sector
- Renewable power
- Announced
- December 2025
- Expected start
- 2027
About this project
The description is as the source gives it.
25-year PPA with Zenith Energy for 256MW wind, 138MW solar and 138MW/300MWh battery storage to supply KCGM Operations. Landmark project expected to provide >70% renewable electricity; also includes JV for 120MW thermal backup and transmission. Evidence: "In December 2025 Northern Star entered into a landmark 25-year power purchase agreement (PPA) with Zenith Energy to develop Australia’s largest renewable energy project for the mining sector. The project will supply energy to Northern Star’s KCGM Operations and comprises 256MW of wind generation, 138MW of solar generation and 138MW/300MWh of battery energy storage." — https://www.nsrltd.com/media/d3xfvj2g/fy26-northern-star-esr-08-climate-change-design-v6.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.