Electric Steam Generators at Manufacturing Sites
This project is operational in Indonesia and Kenya. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Indonesia and Kenya
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2024
About this project
The description is as the source gives it.
Haleon installed electric steam generators at its Pulo Gadung site in Indonesia and Nairobi site in Kenya as part of switching to renewable energy sources and electrifying operations to reduce Scope 1 and 2 emissions in its own manufacturing facilities. Evidence: "We implemented several projects to switch to renewable energy sources such as renewable fuels and electric steam generators, including electric steam generator installation at our sites in Pulo Gadung, Indonesia, and Nairobi, Kenya." — https://www.haleon.com/content/dam/haleon/corporate/documents/investors/oar-2024/haleon-annual-report-and-form-20F-2024.pdf.downloadasset.pdf
Statuses, countries and reductions are as the public source states them, and may be out of date.
Project developers can list this project on Carbon3
Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.