Ford Silverton Assembly Plant Solar Carport
This project is operational in South Africa. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- South Africa
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2022
About this project
The description is as the source gives it.
Ford installed a 13.5 MW solar carport at its Silverton Assembly Plant in Pretoria, South Africa, providing parking for over 3,500 vehicles. Completed in 2022, it supplies 18% of the electricity needed to produce Rangers and contributes to on-site renewable power generation for manufacturing operations. Evidence: "At the Silverton Plant in South Africa, 18% of their power – enough to make 20,800 new Rangers per year – comes from the sun." — https://www.fromtheroad.ford.com/us/en/articles/2024/how-ford-factories-are-using-carparks-to-generate-power
Statuses, countries and reductions are as the public source states them, and may be out of date.