Grayslake Illinois 5.2 MW Rooftop Solar Installation
This project is operational in United States. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- United States
- Sector
- Renewable power
- Announced
- Not stated
- Expected start
- 2026
About this project
The description is as the source gives it.
Medline installed a 5.2-megawatt solar array with over 11,500 panels at its Grayslake, Illinois distribution center. The project produces 5.9 GWh of renewable energy annually as part of Medline's on-site renewables portfolio to reduce operational emissions. Evidence: "today announced plans for a new 5.2-megawatt solar installation at Medline’s flagship distribution center in Grayslake, Ill. The investment will include more than 11,500 solar panels and is expected to produce 5.9 gigawatt hours of energy per year." — https://newsroom.medline.com/releases/medline-announces-new-commercial-solar-installation-in-grayslake/
Statuses, countries and reductions are as the public source states them, and may be out of date.