Skip to main content
Decarbonization project

Guadalajara Biomass Boiler Fuel Switch

This project is operational in Mexico. The source does not give a quantified reduction for this project.

Status
Operational
Estimated reduction
Not quantified in the source
Countries
Mexico
Sector
Fuels and hydrogen
Announced
Not stated
Expected start
Not stated

About this project

The description is as the source gives it.

Installation of a biomass boiler fueled by agricultural waste at PMI's Guadalajara factory in Mexico to replace fossil fuel use. This reduces Scope 1 emissions from manufacturing operations and stabilizes energy costs while engaging local suppliers. Evidence: "At PMI’s Guadalajara factory, a biomass boiler fueled by agricultural waste has been installed. This shift away from fossil fuels is reducing scope 1 emissions and strengthening ties with local suppliers." — https://www.pmi.com/sustainability/case-studies-and-market-stories/building-business-value-through-low-carbon-operations

Statuses, countries and reductions are as the public source states them, and may be out of date.

Project developers can list this project on Carbon3

Project developers can list a project on Carbon3, so that buyers and co-funders can see it. Listing a project costs nothing.

List this project