Halberstadt Global Parts Center Rooftop Photovoltaic System
This project is operational in Germany. The source does not give a quantified reduction for this project.
- Status
- Operational
- Estimated reduction
- Not quantified in the source
- Countries
- Germany
- Sector
- Renewable power
- Announced
- 25 July 2024
- Expected start
- 2025
About this project
The description is as the source gives it.
Daimler Truck installed a 22.1 MWp rooftop PV system at its new Global Parts Center in Halberstadt, Germany, as part of a CO2-neutral energy concept using heat pumps and battery storage. The system generates over 20 million kWh annually, exceeding the site's consumption, with surplus fed to the grid. This on-site renewable generation reduces Scope 1 and 2 emissions at the production/logistics site. Evidence: "Der neue Logistikstandort ist von Beginn an für den CO₂-neutralen Betrieb geplant, das Energiekonzept verzichtet komplett auf fossile Energieträger. Aktuell werden die Dächer der Logistikgebäude, und somit mehr als 90 Prozent aller Dachflächen am Standort, mit Photovoltaik-Modulen ausgestattet. Nach unserer Kenntnis entsteht damit eine der größten sogenannten Aufdach-Photovoltaikanlagen in Europa." — https://www.daimlertruck.com/newsroom/pressemitteilung/daimler-truck-global-parts-center-halberstadt-baufortschritte-nehmen-deutliche-formen-an-52776560
Statuses, countries and reductions are as the public source states them, and may be out of date.